Construction of the Pumping Irrigation System by Royal Irrigation Department (Irrigation System and Related Structures for MC 1 Area) Pak Phanang River Basin Development Project, A.Pak Phanang, Nakhon Sri Thammarat (more details)
Description of Work
Construction of pumping irrigation system and related structures, consisting of construction work for pumping station, embankment, excavation, concrete lining, bridgesand related structures including installation of mechanical and electrical works.
Royal Irrigation Department
Start Date : 7 September 2004
Nakhon Sri Thammarat, Thailand
Contract Value 255,886,109 Baht
×
Bangkok Wastewater Project Stage 4, Turnkey Construction of Stage 4 Works (more details)
Description of Work
Construction of wastewater collection and treatment plant consisting of drilling for concrete pipe dia. 300-2,300 mm., total length of 26.5 km. in Chatuchak, Phrayathai, Huaykwang and Dindaeng. Including construction work for a 150,000 cu.m./day wastewater treatment plant, installation of equipment, electrical work, training, first year operation and maintenance and construction of digesters at the treatment plant.
Bangkok Metropolitan Administration
Start Date : 27 May 2004
Bangkok, Thailand
Contract Value 3,482,027,000 Baht
×
Construction of Water Transmission Tunnel from Taksin-Phetkasem Outer Ring Road to Rama II Road and Related Works (more details)
Description of Work
Installation of transmission tunnel from Taksin-Phet Kasem Outer Ring Road to Rama II Road and related works, total length 6.2 km. The work consist of 2.50 m. dia. shield tunnel 3.5 km. long under khlong, 2.00 m. dia. shield tunnel 2.7 km. long in road, drop structures, riser structure, valve chamber and other works.
Metropolitan Waterworks Authority
Start Date : 16 August 2007
Bangkok, Thailand
Contract Value 616,000,000 Baht
×
Lopburi Agriculture Water Supply, Pasak River Basin Development Project under the Royal Initiation, A. Phatthana Nikom, Lopburi (more details)
Description of Work
Installation of dia. 500-900 mm. steel pipeline 82,128 m. long, dia. 100-400 mm. PVC pipeline 18,145 m. long, total length 100.273 km., construction of 4 pumping stations, 4 storage tanks with capacity of 600-2000 cu.m. each, 6 storage reservoirs with capacity of 130,000 cu.m. each including installation of electrical and mechanical systems.
Royal Irrigation Department
Start Date : 4 March 2009
Lop Buri, Thailand
Contract Value 1,017,339,516.16 Baht
×
Construction of Bang Sue Study and Conservation of Environmental Center Project of Bangkok Metropolitan, Contract 2, Construction of Sewage Collection System for North Bang Sue Area and Discharge of Treated Water into the Canal (more details)
Description of Work
Construction of sewage collection system at Bang Sue and some part of Chatuchak consisting of
300-1,800 mm. dia. RC. pipe of main sewage collection system, the total length is 18,700 m.
355-560 mm. dia. HDPE pipe and RC. pipe of secondary sewage collection system, total length is 4,000 m.
94 interceptors.
145 manholes (Receiving and jacking shafts)
1,500 mm. dia. RC. pipe for discharging treated water intoPrem Prachakorn Canal, the total length is 1,140 m.
Bangkok Metropolitan Administration
Start Date : 28 February 2014
Bangsue and Chatuchak (Some part), Thailand
Contract Value 1,229,900,000 Baht
×
Construction of Other Facilities, Construction of Khlong Ka Tha Reservoir Project, Phuket (more details)
Description of Work
Construction of road around the reservoir, at downstream and access road to the headwork including related structures. All roads are paved with asphaltic concrete, 6.0 m. wide roadway, shoulder width 1.25 m. each. Total length of all roads are 4.911 km., including 192.0 m. length of 4 bridges.
Union Infartech Co., Ltd.
Start Date : 12 December 2014
A.Muang, Phuket, Thailand
Contract Value 88,300,000 Baht
×
Construction of excavation of diversion canal, pumping station, floodgate and building including other works, Contract No. 2, Chanthaburi Flood Relief Project (Phase 2 Plan), Chanthaburi (more details)
Description of Work
Excavation of new diversion canal, distance 3.66 km. and dredging and expansion of existing canal, distance 2.40 km., total distance 6.06 km. by construction of retaining wall type RC. pile. Including dredging of river, 4 no. of road bridges, buildings, 4 no. of floodgates and 1 no. of pumping station.
Royal Irrigation Department
Start Date : 13 September 2016
A.Muang, Chanthaburi, Thailand
Contract Value 1,081,983,392.84 Baht
×
Construction of Reservoir and Buildings including Other Facilities, Construction of Khlong Ka Tha Reservoir Project, Phuket (more details)
Description of Work
Construction rockfill dam, 23.0 m. height, 870 m. long. Including maintenance road for dam, 6m. wide, 1 no. of spillway and 1 no. of transmission pipeline building.
Royal Irrigation Department
Start Date : 20 September 2017
A.Muang, Phuket, Thailand
Contract Value 449,000,000 Baht
×
Baan Eua-Arthorn Housing Project, Samut Songkram (Bangkaew) 2-storey buildings, 482 units, including Utilities, etc. (more details)
Description of Work
Construction of 482 buildings of 2-storey duplex houses, total 482 units. Including 48 rai of embankment, infrastructure such as 8.00-9.00 m. wide internal road, drainage, electrical, water supply and telephone system.
National Housing Authority
Start Date : 4 November 2008
A.Muang, Samut Songkram, Thailand
Contract Value 67,845,750 Baht
×
Baan Eua-Arthorn Housing Project, Samut Prakarn (Theparak 3), 4-storey apartment buildings, 4,020 units, including Utilities, etc. (more details)
Description of Work
Construction of 139 buildings of 4-storey apartment buildings, total 4,020 units. Including 150 rai of embankment, infrastructure such as 6.0, 9.0 and 12.0 m. wide internal road, drainage, collection pond, electrical, water supply and telephone system.
National Housing Authority
Start Date : 16 May 2008
Samut Prakarn, Thailand
Contract Value 1,353,677,000 Baht
×
Baan Eua-Arthorn Housing Project, Hatairat, 5-storey apartment buildings, 1,391 Units, including Utilities, etc. (more details)
Description of Work
Construction of 31 buildings of 5-storey apartment buildings, floor area 33 sq.m., total 1,391 units. Including 29 rai of embankment, infrastructure such as 9.0 and 12.0 m. wide internal road, drainage, electrical, water supply and telephone system.
National Housing Authority
Start Date : 31 March 2008
Hatairat Road, Bangkok, Thailand
Contract Value 501,200,000 Baht
×
Baan Eua-Arthorn Housing Project, Samut Prakarn (Wat Sakhla)5-storey apartment buildings, 853 units, including Utilities, etc. (more details)
Description of Work
Construction of 19 buildings of 5-storey apartment buildings, floor area 33 sq.m., total 853 units. Including 18 rai of embankment, infrastructure such as 9.0 m. wide internal road, drainage, electrical, water supply and telephone system.
National Housing Authority
Start Date : 26 October 2008
A.Phra Samut Chedi, Samut Prakarn, Thailand
Contract Value 324,423,575 Baht
×
Baan Eua-Arthorn Housing Project, Samut Prakarn (Wat Sri Waree Noi) 5-storey apartment buildings, 5,568 units, including Utilities, etc. (more details)
Description of Work
Construction of 124 buildings of 5-storey apartment buildings, floor area 33 sq.m., total 5,568 units. Including 116 rai of embankment, infrastructure such as 6.0, 9.0 and 12.0 m. wide internal road, drainage, electrical, water supply and telephone system.
National Housing Authority
Start Date : 21 January 2008
Soi Wat Sri Waree Noi, Samut Prakarn, Thailand
Contract Value 2,001,369,750 Baht
×
Construction of Songkhla Port Project (more details)
Description of Work
May 17, 1988
1.Dredging of about 4.0 Million Cubic Meters of Material Ranging from clayey silts to sands to provided a channel for access 120 m. wide and of depth 9.0 m. below chart datum. And a basin area for ship maneuvering and turning also of depth 9.0 m. below chart datum
2.A spending beach (Low rock bund) located on a shoal area seaward of the ship Maneuvering and turning area
3.Reclamation of about 13 hectares.
4.The Construction of a new quay about 510 m.long
5.Refurbishment of an existing R.C. Breakwater andextension of the breakwater seaward by about 300 m.
6.The Construction of a transit shed of 6,720 Sq.m.
7.The Construction of Port Building including Mechanical Workshop, Pump House, Gate House, Amenity BlocksCustoms Immigration and Plant Quarantine Building,Checkpost and Garaging for firefighting appliances.
8.Services, including Electricity, Telephone, Potable Waterand Fire Main.
9.The Provision and Installation of Navigation Aids.