Construction of Interchange in Route (more details)
Description of Work
Construction of 2 parallel overpass across the Phet Kasem Road, multi-span concrete I-girder type, span 25.0-51.50 m., 10.5 m. width, 631 m. long., including approach slab, drainage and street lighting.
Department of Rural Roads
Start Date : 30 August 2006
Samut Sakhon, Thailand
Contract Value 210,072,907.71 Baht
×
Construction of Asphaltic Concrete Highway between Ban Sai Kling - Ban Hua Pa, A.Kuan Kanoon, Phatthalung - A.Ra Node, Songkhla (more details)
Description of Work
Construction of 2 lanes asphaltic concrete pavement, 10.0 m. width, 6.196 km. long and RC. bridge, plank girder, I-girder and box girder type, span 10-30 m., 10 m. width, 5.67 km. long., total length 11.866 km., including approach slab, drainage and street lighting.
Department of Rural Roads
Start Date : 22 August 2006
Phatthalung - Songkhla, Thailand
Contract Value 549,000,000 Baht
×
Construction of Route Kor , Sungai Kolok, Naradhiwas, Total Distance 7.325 Km. (more details)
Description of Work
Construction of 4 lanes divided RC pavement 25 cm. thick, 14.0 m. width, 7.325 km. long, including retaining wall, drainage and street lighting.
Department of Rural Roads
Start Date : 21 August 2006
Narathiwas, Thailand
Contract Value 341,249,000 Baht
×
Construction of Special Highway No. 7, Suvarnabhumi Airport - Chonburi, Section 4 (more details)
Description of Work
Construction of 4 lanes divided highway, asphaltic concrete pavement 10 cm. thickness, 13.702 km. long, roadway width 16.80 m. and dualreinforced concrete bridge, girder type, span 21.5-30.0 m., 18.6 m.width, distance 230.88 m. each. Including street lighting and drainage system.
Department of Highways
Start Date : 19 July 2008
Chonburi, Thailand
Contract Value 561,995,000 Baht
×
Construction of Overpass across Intersection of Highway No.4 and 41 (Phatthalung) at Sta. 87+111.159 (more details)
Description of Work
Construction of dual reinforced concrete bridge, span 25.0 - 50.0 m., 12.0 m. width, shoulder 0.55 m. width, distance 325.0 m. each.,and expansion of existing pavement, improvement of intersection, 1.302 km. long. Including street lighting system.
Department of Highways
Start Date : 29 September 2008
Phatthalung, Thailand
Contract Value 198,979,670 Baht
×
Construction of Highway No. 408, Nakhon Sithammarat - A.Satingphra, Section 1 (more details)
Description of Work
Construction of 4 lanes divided highway, asphaltic concrete pavement 10 cm. thickness, 19.116 km. long, roadway width 33.0 m. and 6 numbers of reinforced concrete bridge, slab type, span 7.0-10.0 m., 11.0 m. width, total distance 445.0 m. Including street lighting and drainage system.
Department of Highways
Start Date : 11 August 2009
Nakhon Sithammarat, Thailand
Contract Value 486,479,000 Baht
×
Construction of Highway, Section Hwy. No. 4145 Intersection - Hwy. No.4135 Intersection, A.Sadao, Khlong Hoi Khong, Songkhla, 22.840 Km. long (more details)
Description of Work
Construction of 2 lanes asphaltic concrete pavement, 7.0 m. width, 22.840 km. long, each shoulder width 2.0 m., 5 No. of RC. bridge, plank girder type, span 5.0-10.0 m., 13.0 m. width, 133.5 m. long. and 4 No. of RC. box culvert, 55 m. long, including approach slab, drainage and street lighting.
Department of Rural Roads
Start Date : 19 July 2011
Songkhla, Thailand
Contract Value 159,500,000 Baht
×
Construction of Highway Route No. 4187, 4048, Highway No.41 Intersection - Tale Noi, Part 1, Between Km. 0+000 - Km.2+770 (Highway No. 4187) and Km.11+930 – Km.27+000 (Highway No. 4048), total distance 17.840 km. (more details)
Description of Work
Construction of 2 lanes highway, asphaltic concrete pavement 10 cm. thickness, 17.840 km. long, roadway width 7.00 m., 2.50 m. for each shoulder and extension of 10 No. of RC. bridges, span 5.00 -10.00. m., 7.00 m. width, 208 m. long. Including drainage system and street lighting system.
Department of Highways
Start Date : 10 September 2011
A.Khuan Kanoon, Phatthalung, Thailand
Contract Value 168,789,280 Baht
×
Construction of Highway Section Highway No.417 (Kor Lang) Highway No.4213 (Bang It) including Bridge across Tapi River, Surat Thani (more details)
Description of Work
Construction of 4 lanes divided highway, asphaltic concrete pavement 10 cm. thk. and concrete pavement 25 cm. thk., roadway width 14.00 m., 3.228 km. long (not include bridge across Ta Pi River, 1,284 m. long), 1.50+2.50 m. for each shoulder and construction of 4 No. of RC. bridges, span 8.00- 20.00. m., 11.00 m. width, 386 m. long. Including drainage system and street lighting system.
M.C.Construction Co., Ltd.
Start Date : 30 June 2013
A.Muang, Surat Thani, Thailand
Contract Value 338,265,350.09 Baht
×
Construction of Highway Route Nakhon Si Thammarat - Songkhla, Section Ranot - A.Sathing Phra, Songkhla (Part 1), between Km.82+000.000 - Km.91+500.000, total distance 9.50 Km. long. (more details)
Description of Work
Expanded the surface from 2 lanes to 4 lanes, asphaltic concrete pavement 10 cm. thick, 9.50 km. long, roadway with 3.50 m. each, 2.50 m. for each shoulder, median width 4.20-5.10 m. Construction of dual reinforced concrete bridge, 24 m. long. Including street lighting and drainage
Department of Highways
Start Date : 7 November 2016
A.Ranot, Songkhla, Thailand
Contract Value 284,415,000 Baht
×
Construction of Special Highway Bangyai - Kanchanaburi, between Km.38+500.000 - Km.44+266.833, total distance 5.767 Km. (more details)
Description of Work
Construction of 6 lanes two-way highway (3 lanes each). The surface ismodified asphalt concrete 0.10 m. thick. The base is asphalt concrete boundbase 0.10 m. thick. Each roadway width is 10.80 m., 1.00 m. for each innershoulder, 3.00 m. for each outer shoulder, depressed median width 11.50 m.,2.419 km. long. And construction of 10 no. of bridges, 6,695.6 m. long.Tthe total distance is 5.767 km. long. Including street lighting system.
Department of Highways
Start Date : 21 April 2017
A.Muang, Nakhon Pathom, Thailand
Contract Value 1,911,113,000 Baht
×
Construction of Highway Route No. 4, Satul Bypass, Section Highway No.4 Intersection (Khuan Niang) - Satul (Koh Nok Port), between Km.0+000 - EQ Km.7+787.244 / Km.2+729.735 (Highway No.4051) - EQ Km.10+517.227 / Km.0+000 (Highway No.4051), total distance 10.517 km. (more details)
Description of Work
Construction of 2 lanes highway, asphaltic concrete pavement 10 cm. thk., roadway width 3.50 m. each, 10.517 km. long, 2.50 m. for each shoulder and construction of 4 no. of R.C. bridges, 10.00-20.00 m. span, width 12.00-20.00 m., total length 340.0 m. and box culvert 347.00 m. long. Including drainage system and street lighting system.
Department of Highways
Start Date : 29 September 2017
A.Muang, Sutul, Thailand
Contract Value 306,477,000.00 Baht
×
Construction of Highway No. 408, A.Na Tawee - Dan Prakob, between Km.235+459.000 - Km.251+425.000, total distance 15.966 Km. (more details)
Description of Work
Expanded the surface from 2 lanes to 4 lanes, 2 layers of asphaltic concrete pavement 5 cm. thick each, 15.966 km. long, roadway with 3.50 m. each, 2.50 m. for each shoulder, raised median width 5.00 m. Construction of 6 no. of bridges, 300 m. long. Including street lighting and drainage system.
Department of Highways
Start Date : 29 October 2018
A.Na Tawee, Songkhla, Thailand
Contract Value 542,735,000.00 Baht
×
Construction of Highway Route Nakhon Si Thammarat - Songkhla, Section Ranot - A.Sathing Phra, Songkhla (Part 2), between Km.91+500.000 - Km.114+000.000, total distance 22.50 Km. long. (more details)
Description of Work
Expanded the surface from 2 lanes to 4 lanes, asphaltic concrete pavement 10 cm. thick, 22.50 km. long, roadway with 3.50 m. each, 2.50 m. for each shoulder, median width 4.20-5.10 m. Construction of 3 no. of pedestrian bridges, 90 m. long. Including street lighting and drainage
Department of Highways
Start Date : 17 June 2018
A.Ranot, A.Sathing Phra, Songkhla, Thailand
Contract Value 813,137,000 Baht
×
Construction of Highway No. 408, Nakhon Si Thammarat - A.Sating Phra Section 4, between Km.70+200.000 - Km.82+000.000, total distance 11.800 Km. (more details)
Description of Work
Expanded the surface from 2 lanes to 4 lanes, asphaltic concrete pavement and natural rubber modified asphal concrete 5 cm. thick each, 11.80 km. long, roadway with 3.50 m. each, 2.50 m. for each shoulder, raised median width 4.20 m. Construction of 6 no. of bridges, 272 m. long and 3 no. of pedestrian bridges, 90 m. long. Including street lighting and drainage system.
Department of Highways
Start Date : 30 August 2018
A.Hua Sai, Nakhon Si Thammarat - A.Ranode, Songkhla, Thailand
Contract Value 487,319,000.00 Baht
×
Construction of Elevated Highway Project on Highway No.35, Thon Buri - Pak Tho (Rama 2 Road), Section Bang Khun Thian - Ekachai Interchange Section 1, Bangkok
Description of Work
Construction of elevated highway on Highway No.35 (Rama 2 Road), 6 lanes two-way highway, starting from Bang Khun Thian Interchange at Km. 9+731 to Km. 14+534.904. The distance is 4.804 km, consisting of the construction of the main line on Highway No. 35, precast box segment viaduct type for 6 lanes, 29.20 m wide, 2,415 m long and construction of 6 no. of direction ramps as precast box segment viaduct and I girder type, total length is 4,876.721 m. Including drainage and street lighting system.
Department of Highways
Start Date : 1 January 2022
Bangkok, Thailand
Contract Value 3,994,400,000.00 Baht
×
Construction of Highway No. 3902, Service Road Outside of the Special Highway No.9, Outer Ring Road Western Bangkok, Right Way, Section 2, between Km.56+700.000 RT. - Km.62+300.000 RT., total distance 5.600 Km.
Description of Work
Construction of a new 3-lanes road with concrete pavement 28 cm. thick, 5.255 km. long, roadway width 3.50 m. each, 1.50 m. and 2.50 m. for each shoulder. And construction of 8 no. of bridges, 595 m. long. Including street lighting and drainage system.